During the month of October, work at the site picked up momentum as two items that were on order arrived, allowing installation and subsequent building steps to occur. These items included: the grey water tank and pump, as well as the black HDPE conduit for our electrical service. Due to the red list requirements of the Living Building Challenge, HDPE (high density polyethylene) conduit is used in place of PVC (polyvinyl chloride) pipe and PVC parts within the grey water pump need to be replaced with other products. These items are not yet standard substitutions in the building industry and as a result, delays are often encountered.

Take an image tour of what has happened this month!

Jessica Schultz is Communication and Capital Project Coordinator for the Hitchcock Center. She guides on-going media relations, website and social media, publications, marketing planning and photography. She also supports the Executive Director and building committee in planning for a new environmental learning center.

Comments are closed.

Click here to return to full list of blog entries. Or chose a specific Blog category below.

Blog categories

Share this page with friends!

Recent posts

Blog categories

Archives

Translate »
Hitchcock Center for the Environment